0
By Aiken Staff on November 11th, 2010
Aiken Establishes Feasibility of Subsea Gas Pipeline Lift Procedure Using FEA
Aiken used FEA to determine the optimum lift procedure for a subsea gas pipeline that needed weld repairs.
