0
By Aiken Staff on November 11th, 2010
Aiken Designs Integrated Flange and Lifting Assembly for a BOP
Aiken delivered on a client’s request for a high pressure flange that could lift the BOP once attached.
Aiken delivered on a client’s request for a high pressure flange that could lift the BOP once attached.
Aiken Engineering conducted an engineering analysis on bolted connectors for a new subsea system.