Featured Articles

  • Current Projects

  • 0

    Pressure Monitor Program with Large Channel Count

    This project involved the re-creation of a pressure monitoring program. One copy of the program was on a computer that crashed beyond salvage. The PLCs are nearly obsolete so older software was identified and downloaded. Two programs each monitor about 100 pressure transmitter values. The pressure transmitters are installed on a manifold that interfaces with a […]

  • 0

    Hydraulic Make-Break Tool for Tubing Hanger Running Tool & Test Cap

    This project involved the design, analysis, and procurement of a hydraulic tool to remove and install a pressure test cap from a tubing hanger running tool (THRT). The project scope of work is listed below. Create 3 concepts for the tool and a scaled general arrangement drawing of existing equipment. Compare several component alternatives & design features. 800 […]

  • 0

    Pressure Cycle Tracker Program

    An oil & gas equipment manufacturer requested that their current pressure-temperature test software be revised to track the pressure cycles on components in their lab. The revision included the below scope of work. Define tracked items, pressure cycle, and expected operating life values. Develop a working simulation of the cycle tracker in LabVIEW. Develop a […]

  • 0

    Split Ring Installation Tool

    The purpose of this project was to develop a tool that would install and remove a split ring from a stump. The existing method involved pry bars and hammers, which was not user friendly. A mechanical solution was desired over a hydraulic solution. The deliverables of this project were Strength of Materials calculations for bending of curved […]

  • 0

    API 16A BOP Stripping Test, Replacement of Primary Control Console

    This fixture uses (3) 250 hp pumps and a servo valve to cycle a 14″ bore, 7″ rod, 86″ stroke hydraulic cylinder along a precise motion path to complete an API 16A BOP stripping test. The scope of work as well as pictures of the project are below. LABEL THE CONTROL CONSOLE I/O. Identify, trace, and label […]

  • 0

    API 16A BOP Stripping Test Fixture, Make Existing Fixture Operational

    This scope of work dealt with a a fixture built in the 1977-1983 timeframe and repaired in 1993 and 2003. The fixture uses (3) 250 hp pumps and a servo valve to cycle a 14″ bore, 7″ rod, 86″ stroke hydraulic cylinder along a precise motion path to complete an API 16A BOP stripping test. The fixture lost some […]

  • More from Current Projects